X
Construction Updates

Cranes installed at Country Club Towers site

September 23, 2015 0

Last week cranes were installed at the construction site of Denver’s Country Club Towers . I took some photos as the cranes were being assembled.

Country Club Towers

The first units for the Country Towers are slated to be delivered in July of 2017. In total this project will house 558 apartments and 1005 parking space will be built into the towers. Units will be available in studio, one bedroom and two bedroom options. All units will have floor-to-ceiling glass, granite surfaces, stainless steel appliances and washers/dryers. An amenity deck with a swimming pool will also be featured.

The Country Club Towers will rise to 31 stories. This project is being developed by Denver-based The Broe Group.

Country Club Towers

Photo captured from the sidewalk on Downing Street.

For more information take a look at this article that covered the ground breaking of the Country Club Towers.

1

There are 0 comments

Leave a Reply

Your email address will not be published. Required fields are marked *